Geology and Hydrogeology

Sde Dov – hydrogeology and soil excesses

Herzliya coastal cliff

DPW – Highway 38 – Hydrogeology

DPW – Highway 44 – Hydrogeology and Ecology

Nachshonim opposition to the quarry

Survey of various quarries

Gaza sea obstacle

Palmachim drilling

Herzliya – sand hill

Timna geological mapping

Beit Shemesh – Bialik Complex – Geology

Land mines in Arava

Haifa port – sediment suspension

Hydrological annex to the Shaar Ha’ir-Netivot gas station

Environmental hydrological annex – lots in the Modiin Region industrial area

Tama 38

Light rail green line – Tel Aviv section – tunnel and stations

Ayelet Hashar –  Te’enim Landfill- hazard assessment

Alon Tavor power plant – construction of new production units – geology

Ongoing consultation for Tel Aviv Municipality

Hydro-geological opinion for the Victory Complex in Gan Yavne

Amiad pool – seismic risks

Sarig Landfill – renewal of investigation and rehabilitation

Migdal Tzedek – waste survey

Waste calculator


Select a construction type

הכנס שטח מגרש

(מ"ר)

הכנס אחוז בניה

(%)

The estimated amount of concrete waste is:

מעבר להודעה
1
שלום לך!
אשמח לענות לך על כל שאלה.
לך נשאר רק ללחוץ על הכפתור למטה לשליחת הודעה.
Skip to content