Infrastructure Projects

Construction support – the train route to Jerusalem

Survey for road 6 – section 7

Environmental planning/planning control for about 10 power plants in Israel

Public Works Department [Israel Roads] – quality control for environmental issues

Ashdod container port

The South Port of Ashdod Upper Structure

Haifa port – sediment suspension

VATAL Environmental Consulting – Energy

Tama 37 Natural gas – various segments throughout the country

Back of Haifa port

Megiddo Prison – new site

Tapuch – Mekorot station

Kfar Glikson – food center

Elifaz Mekorot Pool

Redline – Gush Dan mass transit system

Nachshonim opposition to Road 4711

Nachshonim opposition to the quarry 2015

Nachshonim opposition to the quarry 2017

Herzliya opposition to TMM 5

Yotvata Mekorot Pool

Stone crusher- Environmental opinion

Fifth line to Jerusalem

Western Yarkon Mekorot line

IPC – Ashdod coal terminal

Tel Nof Airport – master plan

Tel Aviv transportation terminals

Ramat Hasharon – WTE waste incinerator

Light rail green line – Tel Aviv section – tunnel and stations

Shafdan – end facility for waste

Port of Ashdod – the lateral road

Mount Ayit – pumped storage facility

Ramat Gan – purple line in the Aluf Sade section

Gan Shorek – wholesale market

Haifa Port Company – adequacy control

Taiba – an environmental document for a construction permit for a transfer station for yard waste

Gvulot – an environmental impact survey for an aircraft runway

Haifa – environmental document for a compost site

Waste calculator


Select a construction type

הכנס שטח מגרש

(מ"ר)

הכנס אחוז בניה

(%)

The estimated amount of concrete waste is:

מעבר להודעה
1
שלום לך!
אשמח לענות לך על כל שאלה.
לך נשאר רק ללחוץ על הכפתור למטה לשליחת הודעה.
Skip to content