Transportation infrastructure projects

  • Environmental monitoring is being carried out during the construction of the Purple Line of the light rail in the Tel Aviv area.

 

  • Tunneling and station aspects of the Tel Aviv section of the Green Line light rail.

 

  • Supporting the planning of the Red Line of the light rail in the Tel Aviv area, including tunnel sections.

 

  • Ongoing consulting for Netivei Israel Company in the areas of environmental planning, air quality, ecology, soil pollution, and hydrogeology.

 

  • Consulting the Ministry of Construction and Housing on road plans in environmental planning and ecology aspects.

 

  • Examination of soil contamination at the Tira train station.

 

  • Historical Soil survey for the section of Highway No. 444 between Eyal Junction and the edges of Taiba.

 

  • Environmental support for the expansion of Highway No. 784 in Karmiel.

 

  • Environmental support for opposition to the expansion of Haifa Airport.

 

  • Preparation of an environmental impact assessment document for the northern access road plan to the “HaDarom” seaport in Ashdod.

 

  • Seismic appendix to the plan for connecting South Ashdod with Highway No. 4.

 

  • Environmental support for the renovation of the breakwater at Haifa Seaport.
  • Environmental aspects in a policy document for the old central bus station in Tel Aviv.

 

  • Environmental aspects of the expansion of Highway No. 6 for Derech Eretz company.

 

  • Environmental aspects of the “Sde Teyman” airstrip expansion plan.

 

  • Examining options for reducing air pollution from transportation in the Sharon municipalities (Ra’anana and Kfar Saba).

 

  • Preparing an environmental impact assessment for Road Plan No. 4431.

 

  • Preparing an environmental impact assessment for an airstrip in “Gvulut”.

 

  • Preparation of due diligence for Haifa Port Company.

 

  • Recommendation for the location of bus terminals in Tel Aviv.

 

  • Investigation of soil contamination at the old Egged complex in Rishon LeZion.

 

  • Involvement in preparing a master plan for Tel Nof Airport.

 

  • Preparing an environmental impact assessment for section 7 (Yokneam Bypass) on Highway No. 6

 

  • Environmental supervision and monitoring of the construction of the railway route to Jerusalem.

Waste calculator


Select a construction type

הכנס שטח מגרש

(מ"ר)

הכנס אחוז בניה

(%)

The estimated amount of concrete waste is:

Skip to content