Skip to content
03-9739911
adama@adam-ma.co.il
Sunday - Thursday 9:00 - 18:00
Instagram
Facebook-f
Twitter
Google-plus-g
Youtube
Search
home
Areas of Activity
Projects
About
Team
Contact Us
HE
home
Areas of Activity
Projects
About
Team
Contact Us
HE
Waste calculator
Transportation infrastructure projects
Environmental monitoring is being carried out during the construction of the Purple Line of the light rail in the Tel Aviv area.
Tunneling and station aspects of the Tel Aviv section of the Green Line light rail.
Supporting the planning of the Red Line of the light rail in the Tel Aviv area, including tunnel sections.
Ongoing consulting for Netivei Israel Company in the areas of environmental planning, air quality, ecology, soil pollution, and hydrogeology.
Consulting the Ministry of Construction and Housing on road plans in environmental planning and ecology aspects.
Examination of soil contamination at the Tira train station.
Historical Soil survey for the section of Highway No. 444 between Eyal Junction and the edges of Taiba.
Environmental support for the expansion of Highway No. 784 in Karmiel.
Environmental support for opposition to the expansion of Haifa Airport.
Preparation of an environmental impact assessment document for the northern access road plan to the “HaDarom” seaport in Ashdod.
Seismic appendix to the plan for connecting South Ashdod with Highway No. 4.
Environmental support for the renovation of the breakwater at Haifa Seaport.
Environmental aspects in a policy document for the old central bus station in Tel Aviv.
Environmental aspects of the expansion of Highway No. 6 for Derech Eretz company.
Environmental aspects of the “Sde Teyman” airstrip expansion plan.
Examining options for reducing air pollution from transportation in the Sharon municipalities (Ra’anana and Kfar Saba).
Preparing an environmental impact assessment for Road Plan No. 4431.
Preparing an environmental impact assessment for an airstrip in “Gvulut”.
Preparation of due diligence for Haifa Port Company.
Recommendation for the location of bus terminals in Tel Aviv.
Investigation of soil contamination at the old Egged complex in Rishon LeZion.
Involvement in preparing a master plan for Tel Nof Airport.
Preparing an environmental impact assessment for section 7 (Yokneam Bypass) on Highway No. 6
Environmental supervision and monitoring of the construction of the railway route to Jerusalem.
Sample Projects (HE)
חידוש שובר הגלים בנמל חיפה
קרא עוד »
דרך הגישה הצפונית לנמל הדרום באשדוד
קרא עוד »
ליווי תכנון הקו האדום של הרכבת הקלה בגוש דן
קרא עוד »
Scroll Up
home
Areas of Activity
Projects
About
Team
Contact Us
HE
home
Areas of Activity
Projects
About
Team
Contact Us
HE
Waste calculator
Select a construction type
בחר תשובה
בניה רגילה למגורים
בנייה טרומית למגורים
בנייה ציבורית ומשרדים
מסחר ותעשייה
מרתפים
הריסה
חפירה או עודפי עפר
הכנס שטח מגרש
(מ"ר)
הכנס אחוז בניה
(%)
חשב
The estimated amount of concrete waste is:
1
WhatsApp
שלום לך!
אשמח לענות לך על כל שאלה.
לך נשאר רק ללחוץ על הכפתור למטה לשליחת הודעה.
מעבר להודעה
Skip to content
Open toolbar
Accessibility Tools
Accessibility Tools
Increase Text
Increase Text
Decrease Text
Decrease Text
Grayscale
Grayscale
High Contrast
High Contrast
Negative Contrast
Negative Contrast
Light Background
Light Background
Links Underline
Links Underline
Readable Font
Readable Font
Reset
Reset