Waste and Landfills

SP Nahariya

SP Harnesses

SP Givat Olga

Menachem bridge

Thin resistance

Hirayeh – construction waste recycling facility

Tayba Bor from Sarawa

Environmental pumice stone crusher

Ma’ale Adumim – excess dirt

Naan-Ether Gazm

Emek Habakah excess dirt

SP Holon – Pilot

A periodical check-up

Mamiyan crossing stations – location

Beit Gamliel transit station

Tel Sheva – neighborhood 20

Tel Sheva a. A is sleeping

Construction waste transit station

Arara – transit station

Nachshonim – control of the Pla plant

Chief of Staff – ongoing consultation

Taiba – control of changes in SP

Ramat Nabatim – waste annex

Tel Sheva – Complex 3 waste annex

Waste calculator


Select a construction type

הכנס שטח מגרש

(מ"ר)

הכנס אחוז בניה

(%)

The estimated amount of concrete waste is:

מעבר להודעה
1
שלום לך!
אשמח לענות לך על כל שאלה.
לך נשאר רק ללחוץ על הכפתור למטה לשליחת הודעה.
Skip to content