Promoting plans and building permits for various types of transportation projects, such as roads, elevated or underground railways, seaports or airports, requires the preparation of environmental documents that are examined by the various environmental authorities – such as the Ministry of Environmental Protection or environmental consultants to the Planning Administration – during the early, detailed planning and implementation stages of the plan.

 

In recent years, environmental aspects during the implementation phase have received much more attention and sometimes require environmental monitoring, reporting on the achievement of milestones, and quantitative measurements of noise, air quality, and radiation.

 

Environmental documents for programs of this type include dealing with various environmental disciplines such as air quality, noise and vibration, radiation, natural values, soil contamination and geology, etc. In all of this, our company has acquired extensive experience.

Sample Projects (HE)

Environmental control over the construction of the Purple Line of the Gush Dan Light Rail

Aspects of tunneling and stations in the Tel Aviv section of the Green Line of the Gush Dan Light Rail

Assistance in the planning of the Red Line of the Gush Dan Light Rail, including tunneling sections

Advice to the Ministry of Construction and Housing on road plans in terms of environmental planning and ecology

Waste calculator


Select a construction type

הכנס שטח מגרש

(מ"ר)

הכנס אחוז בניה

(%)

The estimated amount of concrete waste is:

Skip to content